Navarre’s Managing Director, Ian Holland, spent some time this week at its Mt Carlton Operation to see the results the new ore from Mt Carlton United (MCU) through the processing plant.

Ore from the new MCU gold-copper-silver deposit is blended with ore from the Mt Carlton V2 deposit to optimize concentrate grade generation matching. The processing plant, which is located just 2.5 km south of the V2 deposit, produces a concentrate that is bagged on site, and then transported to the Townsville port.